Category Archives: Messages to the Resistance Movement(RM)

Message for the Resistance Movement: April 5, 2017 — The Event Chronicle

Thursday, April 6, 2017 Alert downgrade to red, N stable.Black alert at 504, black grid ratio alert, N danger The above is a coded messages for the Resistance Movement as communicated by Cobra on Portal 2012. These messages are not meant for the general population, and are not meant to be understood by us. This article (Message for the Resistance Movement: April 5, 2017)…

via Message for the Resistance Movement: April 5, 2017 — The Event Chronicle

The Portal: STATE OF MISSION REPORT MARCH 2017

Sunday, April 2, 2017

STATE OF MISSION REPORT MARCH 2017

Pandora in progress, EELA in progress. Drastic Systems/Isidic security breach, in deflection. HVBN substable to stable. M minimum requirements met, Midas packages.

Continue reading The Portal: STATE OF MISSION REPORT MARCH 2017

Security breach deflected, evaluate SIMORPH / VTXMORPH — The Portal

Security breach deflected, evaluate SIMORPH / VTXMORPH

via — The Portal

The Portal

Tuesday, February 7, 2017

Remove LL3-LL1 and LL0-, sublunar CHIF/DF/DF detected

Source: The Portal

The Portal: STATE OF MISSION REPORT JANUARY 2017

Thursday, February 2, 2017

Pandora in progress, EELA in progress. 10k96M detected. 96Alters detected, removal in progress.HVBN substable to stable. M minimum requirements met.

Source: The Portal: STATE OF MISSION REPORT JANUARY 2017

96Alters detected/10k96M detected

Monday, January 16, 2017

96Alters detected

P

Monday, January 16, 2017

10k96M detected

via — The Portal

STATE OF MISSION REPORT 2016 — The Portal

Cobra in progress, Pandora in progress, multiple EXMOSS / EELA / ZEOLITE sequences in progress, BIOCHIP layer removal in progress, U96 / TOPAZ activated, ATLANTIS12 clear. Several systems / Isidic security breaches, all deflected, HVBN unstable towards stable. Two PB removal attempts with results pending. M minimum requirements met.

via STATE OF MISSION REPORT 2016 — The Portal

STATE OF MISSION REPORT DECEMBER 2016 — The Portal

Pandora in progress, EELA in progress, ATLANTIS12 clear, TOPAZ and ZEOLITE in progress, RR8 complete. Systems/Isidic security breach. HVBN substable to stable. M minimum requirements met.

via STATE OF MISSION REPORT DECEMBER 2016 — The Portal

ZEOLITE EXMOSS phase beta sequence in progress — The Portal

ZEOLITE EXMOSS phase beta sequence in progress

via — The Portal

ATLANTIS12 clear— The Portal

ATLANTIS12 clear

via — The Portal

RR8 complete — The Portal

RR8 complete

via — The Portal

Systems security breach at 504— The Portal

Systems security breach at 504

via — The Portal

Op Topaz in progress – The Portal

Saturday, December 3, 2016

Op Topaz in progress

Source: The Portal

Resistance Movement: State of Mission Report November 2016 — The Event Chronicle

Pandora in progress, EELA in progress. Systems/Isidic security breach, HVBN substable to stable. M minimum requirements met. The above is a coded messages for the Resistance Movement as communicated by Cobra on Portal 2012. These messages are not meant for the general population, and are not meant to be understood by us. Source: Cobra — The…

via Resistance Movement: State of Mission Report November 2016 — The Event Chronicle

BIOCHIP primary trigger – The Portal

I can’t even guess what that is about -> Brian

Friday, September 2, 2016

U96/21127 timeline integration complete – The Portal

WOW! What can I say?? -> Brian

Wednesday, August 24, 2016

U96/21127 timeline integration complete

Evaluate U96

Continue reading U96/21127 timeline integration complete – The Portal

The Portal: A Short Message to the General Population

Wednesday, August 10, 2016

A Short Message to the General Population

Clearing of the Chimera group continues with moderate success. After mid-August, more intel will be gradually released to the general population. Victory of the Light!

Source: The Portal: A Short Message to the General Population

The Portal

Wednesday, July 6, 2016

EXMOSS primary sequence complete

 

Source: http://2012portal.blogspot.com.au/

The Portal: STATE OF MISSION REPORT JUNE 2016

Friday, July 1, 2016

STATE OF MISSION REPORT JUNE 2016

Pandora in progress, EELA in progress, EXMOSS primary sequence in progress. HVBN substable to stable. M=34, Midas package.

http://2012portal.blogspot.com.au/2016/07/state-of-mission-report-june-2016.html