Category Archives: #alliancemessages

The Portal

MPD filter development..

Source: http://2012portal.blogspot.com/2020/05/blog-post_13.html

The Portal

VTX stabilized, basic filtration protocol established..

Source: http://2012portal.blogspot.com/2020/05/blog-post_1.html

STATE OF MISSION REPORT APRIL 2020

Pandora in progress, ongoing gamma grid ratio disruption, L2LSIP temporary abort, Project 502 on hold. GR+. Drastic VTX / Systems security breach at 504, deflected. Minimum M / HP requirements met, VTX / SD / DL requirements not met…

Source: http://2012portal.blogspot.com/2020/05/state-of-mission-report-april-2020.html

The Portal

URGENT EXIT protocol fully enforced..

Source: http://2012portal.blogspot.com/2020/04/blog-post_25.html

The Portal

Top domain parameter secure, evaporation sequence..

Source: http://2012portal.blogspot.com/2020/04/blog-post_10.html

STATE OF MISSION REPORT MARCH 2020

Pandora in progress, ongoing gamma grid ratio disruption, PBHL TOP anomaly detected. L2LSIP unstable, Project 502 on hold. Minimum M / DL / HP requirements met, VTX and SD requirements not met. Significant M insertion…

Source: http://2012portal.blogspot.com/2020/04/state-of-mission-report-march-2020.html

STATE OF MISSION REPORT FEBRUARY 2020

Pandora in progress, gamma grid ratio disruption. L2LSIP stable, Project 502 operational. Minimum M / DL / HP requirements met, VTX and SD requirements not met…

Source: http://2012portal.blogspot.com/2020/03/state-of-mission-report-february-2020.html

The Portal

L2LSIP stable..

Source: http://2012portal.blogspot.com/2020/02/blog-post_26.html

The Portal

L2LSIP operational, stability test..

Source: http://2012portal.blogspot.com/2020/02/blog-post_5.html

The Portal

Minimum L2LSIP security requirements met, modulation in progress, P502v1…

Source: http://2012portal.blogspot.com/2020/02/blog-post_25.html

The Portal

Initialize Project 502, modulation target 200223…

Source: http://2012portal.blogspot.com/2020/02/initialize-project-502-modulation.html

STATE OF MISSION REPORT JANUARY 2020

L4 Pandora sequence in progress. GR+, exit optimization in progress. Minimum M / DL / HP requirements met, VTX and SD requirements not met…

Source: http://2012portal.blogspot.com/2020/02/state-of-mission-report-january-2020.html

STATE OF MISSION REPORT NOVEMBER 2019

L4 Pandora sequence in progress, project 501 merged into MASTERPIECE. VTXC systems security breach deflected. Minimum M / DL / HP requirements met, VTX and SD requirements not met…

Source: http://2012portal.blogspot.com/2019/12/state-of-mission-report-november-2019.html

STATE OF MISSION REPORT OCTOBER 2019

MOSS Pandora sequence in progress, project 501 to merge into MASTERPIECE at ST point. VTXC systems security breach, in deflection, brief RM2m L0 MASTERPIECE sequence prevented L0 collapse. Minimum M / DL / HP requirements met, VTX and SD requirements not met…

Source: http://2012portal.blogspot.com/2019/11/state-of-mission-report-october-2019.html

Project 501 Update

All protocols clear and operational, 501/MASTERPIECE integration set at ST point. INT YXR flow recovery almost complete, except for recent VTXC disruption which modifies YXR protocols (VTX.1 downgrade). Project 310 aborted and project 061 downgraded due to unfavorable grid ratio…

Source: http://2012portal.blogspot.com/2019/09/project-501-update.html

2020

On the cosmic scale, the shift into the next cosmic cycle continues…

Source: http://2012portal.blogspot.com/2019/09/2020.html

STATE OF MISSION REPORT AUGUST 2019

EXMOSS Pandora sequence in progress. Project 310 total abort due to security breach, systems security breach recovery in progress. Minimum M / HP / VTX requirements met, SD requirements not met, DL requirements not met…

Source: http://2012portal.blogspot.com/2019/09/state-of-mission-report-august-2019.html

The Portal

Security breach at 310, project permanently aborted..

Source: http://2012portal.blogspot.com/2019/08/blog-post_28.html

The Portal

Systems security breach at 504..

Source: http://2012portal.blogspot.com/2019/08/blog-post.html

The Portal

Security breach deflected, sublunar EELA in position..

Source: http://2012portal.blogspot.com/2019/07/blog-post_23.html

The Portal

VTXC/Systems security breach at 504..

Source: http://2012portal.blogspot.com/2019/07/blog-post.html

STATE OF MISSION REPORT JUNE 2019

EXMOSS Pandora sequence in progress, cosmic rootkit detected, removal in progress, N22 detected, removal in progress. Project 501 final integration into MASTERPIECE in progress, internal YXR flow / multiphasic recovery in progress, PB recovery failure…

Source: http://2012portal.blogspot.com/2019/07/state-of-mission-report-june-2019.html

The Portal

Systems alert downgrade to yellow..

Source: http://2012portal.blogspot.com/2019/06/blog-post_23.html

The Portal

Systems alert upgrade to red..

Source: http://2012portal.blogspot.com/2019/06/blog-post_18.html

The Portal

Systems alert upgrade to red..

Source: http://2012portal.blogspot.com/2019/06/blog-post_16.html